Current RFPs and Business Opportunities
RFPs/ biz Opportunities Search results
03/21/21
Runway Overlay Project
SEALED PROPOSALS for the RUNWAY 7/25 REHABILITATION at the Fort Smith Regional Airport, Fort Smith, Arkansas will be received until 2:00 P.M. CDT on Tuesday, April 13, 2021.
THE PROJECT is planned to be constructed during the Summer and Fall months in 2021 and generally consists of the rehabilitation of Runway 7/25 (8,417’ length x 150’ width) per FAA specifications, including, but not limited to, demolition and pavement restoration of two (2) in-pavement aircraft arresting systems, asphalt cold milling, asphalt crack repair, asphalt deep patching, paving fabric, 3-inch min. asphalt overlay, pavement grooving, pavement markings, runway/taxiway lighting and sign modifications, among other related items of work.
The full Advertisement for Bids is located at www.flyfsm.com under Business Opportunities.
Email: michael@fortsmithairport.com
WebPage: https://flyfsm.com/business-opportunities-2/